ip4 Data Centre Construction

ip4 – Data Centre Construction

We plan, design and build data centres, server rooms and switchgear – from the first idea through site analysis, planning, implementation and construction to later operation. As operators of our own data centre space we know from practice what really matters. Our focus is on Schleswig-Holstein and the whole of northern Germany.

Idea and site analysis

Together with you we clarify what the data centre has to deliver and assess possible sites: plot and building, power supply, fibre connectivity, risks and permits.

Planning and concept

Requirements analysis, space, power and cooling demand, availability and protection classes according to the DIN EN 50600 series of standards, energy efficiency, cost-effectiveness and future expandability.

Geo-redundancy

For high resilience we plan geo-redundant solutions: systems and data are distributed across physically separate sites so that an outage at one location does not interrupt operations. Our own sites in Flensburg-Handewitt, Hamburg and Amsterdam provide the basis for this.

Design

Room and rack layout, switchgear and power supply with UPS and standby generators, air conditioning, fire protection and early fire detection, access control, structured copper and fibre cabling, and monitoring of all technical systems.

Construction and implementation

Coordination of all trades, site management, installation and commissioning, documentation and acceptance – all from a single source.

Operation and further development

On request we take over monitoring, maintenance and operation of your data centre once it is completed – or we support your own team.

Reference: Datacenter Flensburg-Handewitt

One example from our practice is the Datacenter Flensburg-Handewitt in Schleswig-Holstein – from site analysis through planning and construction to operation, all from a single source and designed according to DIN EN 50600.

Images: Datacenter Flensburg-Handewitt (aerial view: drone photo, visualised; air-conditioning units, server room, gas fire suppression, security area) – click to enlarge.

Do you have questions or a project in mind? Get in touch – by phone at +49 4639 78329-0 or by e-mail at info@ip4-gmbh.de.